Difference between revisions of "User:Hirmuolio Pine/sandbox"
From EVE University Wiki
Line 74: | Line 74: | ||
= resource = | = resource = | ||
{| class="wikitable collapsible collapsed" | {| class="wikitable collapsible collapsed" | ||
− | ! colspan = 4 | Resource processing rigs | + | ! colspan = 4 style="width: 910px"| Resource processing rigs |
|- | |- | ||
− | ! Improved | + | ! Effect |
− | + | ! M-rig | |
− | + | ! L-rig | |
− | + | ! XL-rig | |
+ | |- | ||
+ | | Improved refinng yeld for asterod ores | ||
+ | | Asterod Ore Gradng Processor | ||
+ | | rowspan="3" | Reprocessng Montor | ||
+ | | rowspan="3" | Reprocessng Montor | ||
|- | |- | ||
| Improved refining yeld for asteroid ores | | Improved refining yeld for asteroid ores | ||
− | | | + | | Asteroid Ore Grading Processor |
|- | |- | ||
| Improved refining yeld for moon asteroids | | Improved refining yeld for moon asteroids | ||
− | | | + | | Moon Ore Grading Processor |
|- | |- | ||
| Improved refining yeld for ice | | Improved refining yeld for ice | ||
− | | | + | | ce Grading Processor |
− | | rowspan="6" | | + | | rowspan="6" | Reactor Effcency |
| rowspan="8" | | | rowspan="8" | | ||
|- | |- | ||
| Biochemical reactions material usage reduction | | Biochemical reactions material usage reduction | ||
− | | | + | | Biochemical Reactor Material Efficiency |
|- | |- | ||
| Biochemical reactions time duration reduction | | Biochemical reactions time duration reduction | ||
− | | | + | | Biochemical Reactor Time Efficiency |
|- | |- | ||
| Composite reactions material usage reduction | | Composite reactions material usage reduction | ||
− | | | + | | Composite Reactor Material Efficiency |
|- | |- | ||
| Composite reactions time duration reduction | | Composite reactions time duration reduction | ||
− | | | + | | Composite Reactor Time Efficiency |
|- | |- | ||
| Hybrid reactions material usage reduction | | Hybrid reactions material usage reduction | ||
− | | | + | | Hybrid Reactor Material Efficiency |
|- | |- | ||
| Hybrid reactions time duration reduction | | Hybrid reactions time duration reduction | ||
− | | | + | | Hybrid Reactor Time Efficiency |
− | | rowspan="2" | | + | | rowspan="2" | Moon Drllng Profcency |
|- | |- | ||
| ncreased moon driling yeld | | ncreased moon driling yeld | ||
− | | | + | | Moon Drilling Efficiency |
|} | |} | ||
= combat = | = combat = |
Revision as of 10:09, 26 December 2019
manufacturing
Engineering rigs | |||
---|---|---|---|
Effect | M-rig | L-rig | XL-rig |
T2 component material usage reduction | Advanced Component Manufacturing Material Efficiency | Advanced Component Manufacturing Efficiency | Structure and Component Manufacturing Efficiency |
T2 component time duration reduction | Advanced Component Manufacturing Time Efficiency | ||
Capital component material usage reduction | Basic Capital Component Manufacturing Material Efficiency | Basic Capital Component Manufacturing Efficiency | |
Capital component time duration reduction | Basic Capital Component Manufacturing Time Efficiency | ||
Structure, structure component, structure rig and fuel block material usage reduction |
Structure Manufacturing Material Efficiency | Structure Manufacturing Efficiency | |
Structure, structure component, structure rig and fuel block time duration reduction |
Structure Manufacturing Time Efficiency | ||
T1 small ship material usage reduction | Basic Small Ship Manufacturing Material Efficiency | Basic Small Ship Manufacturing Efficiency | Ship Manufacturing Efficiency |
T1 small ship time duration reduction | Basic Small Ship Manufacturing Time Efficiency | ||
T1 medium ship material usage reduction | Basic Medium Ship Manufacturing Material Efficiency | Basic Medium Ship Manufacturing Efficiency | |
T1 medium ship time duration reduction | Basic Medium Ship Manufacturing Time Efficiency | ||
T1 large ship material usage reduction | Basic Large Ship Manufacturing Material Efficiency | Basic Large Ship Manufacturing Efficiency | |
T1 large ship time duration reduction | Basic Large Ship Manufacturing Time Efficiency | ||
T2 Small ship material usage reduction | Advanced Small Ship Manufacturing Material Efficiency | Advanced Small Ship Manufacturing Efficiency | |
T2 small ship time duration reduction | Advanced Small Ship Manufacturing Time Efficiency | ||
T2 medium ship material usage reduction | Advanced Medium Ship Manufacturing Material Efficiency | Advanced Medium Ship Manufacturing Efficiency | |
T2 medium ship time duration reduction | Advanced Medium Ship Manufacturing Time Efficiency | ||
T2 large ship material usage reduction | Advanced Large Ship Manufacturing Material Efficiency | Advanced Large Ship Manufacturing Efficiency | |
T2 large ship time duration reduction | Advanced Large Ship Manufacturing Time Efficiency | ||
Ammunition materual usage reduction | Ammunition Manufacturing Material Efficiency | Ammunition Manufacturing Efficiency | Equipment and Consumable Manufacturing Efficiency |
Ammunition time duration reduction | Ammunition Manufacturing Time Efficiency | ||
Drone and fighter material usage reduction | Drone and Fighter Manufacturing Material Efficiency | Drone and Fighter Manufacturing Efficiency | |
Drone and fighter time duration reduction | Drone and Fighter Manufacturing Time Efficiency | ||
Ship module, ship rig, deployable, implant and cargo container material usage reduction |
Equipment Manufacturing Material Efficiency | Equipment Manufacturing Efficiency | |
Ship module, ship rig, deployable, implant and cargo container time duration reduction |
Equipment Manufacturing Time Efficiency | ||
Blueprint copy ISK cost reduction | Blueprint Copy Cost Optimization | Blueprint Copy Optimization | Laboratory Optimization |
Blueprint copy time duration reduction | Blueprint Copy Accelerator | ||
ME research ISK cost reduction | ME Research Cost Optimization | ME Research Optimization | |
ME research time duration reduction | ME Research Accelerator | ||
TE research ISK cost reduction | TE Research Cost Optimization | TE Research Optimization | |
TE research time duration reduction | TE Research Accelerator | ||
Invention ISK cost reduction | Invention Cost Optimization | Invention Optimization | |
Invention time duration reduction | Invention Accelerator |
resource
Resource processing rigs | |||
---|---|---|---|
Effect | M-rig | L-rig | XL-rig |
Improved refinng yeld for asterod ores | Asterod Ore Gradng Processor | Reprocessng Montor | Reprocessng Montor |
Improved refining yeld for asteroid ores | Asteroid Ore Grading Processor | ||
Improved refining yeld for moon asteroids | Moon Ore Grading Processor | ||
Improved refining yeld for ice | ce Grading Processor | Reactor Effcency | |
Biochemical reactions material usage reduction | Biochemical Reactor Material Efficiency | ||
Biochemical reactions time duration reduction | Biochemical Reactor Time Efficiency | ||
Composite reactions material usage reduction | Composite Reactor Material Efficiency | ||
Composite reactions time duration reduction | Composite Reactor Time Efficiency | ||
Hybrid reactions material usage reduction | Hybrid Reactor Material Efficiency | ||
Hybrid reactions time duration reduction | Hybrid Reactor Time Efficiency | Moon Drllng Profcency | |
ncreased moon driling yeld | Moon Drilling Efficiency |