User:Hirmuolio Pine/sandbox
From EVE University Wiki
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
manufacturing
Engineering rigs | |||
---|---|---|---|
Effect | M-rig | L-rig | XL-rig |
T2 component material usage -2% | Advanced Component Manufacturing Material Efficiency | Advanced Component Manufacturing Efficiency | Structure and Component Manufacturing Efficiency |
T2 component time duration -20% | Advanced Component Manufacturing Time Efficiency | ||
Capital component material usage -2% | Basic Capital Component Manufacturing Material Efficiency | Basic Capital Component Manufacturing Efficiency | |
Capital component time duration -20% | Basic Capital Component Manufacturing Time Efficiency | ||
Structure, structure component, structure rig and fuel block material usage -2% | Structure Manufacturing Material Efficiency | Structure Manufacturing Efficiency | |
Structure, structure component, structure rig and fuel block time duration -20% | Structure Manufacturing Time Efficiency | ||
T1 small ship material usage -2% | Basic Small Ship Manufacturing Material Efficiency | Basic Small Ship Manufacturing Efficiency | Ship Manufacturing Efficiency |
T1 small ship time duration -20% | Basic Small Ship Manufacturing Time Efficiency | ||
T1 medium ship material usage -2% | Basic Medium Ship Manufacturing Material Efficiency | Basic Medium Ship Manufacturing Efficiency | |
T1 medium ship time duration -20% | Basic Medium Ship Manufacturing Time Efficiency | ||
T1 large ship material usage -2% | Basic Large Ship Manufacturing Material Efficiency | Basic Large Ship Manufacturing Efficiency | |
T1 large ship time duration -20% | Basic Large Ship Manufacturing Time Efficiency | ||
T2 Small ship material usage -2% | Advanced Small Ship Manufacturing Material Efficiency | Advanced Small Ship Manufacturing Efficiency | |
T2 small ship time duration -20% | Advanced Small Ship Manufacturing Time Efficiency | ||
T2 medium ship material usage -2% | Advanced Medium Ship Manufacturing Material Efficiency | Advanced Medium Ship Manufacturing Efficiency | |
T2 medium ship time duration -20% | Advanced Medium Ship Manufacturing Time Efficiency | ||
T2 large ship material usage -2% | Advanced Large Ship Manufacturing Material Efficiency | Advanced Large Ship Manufacturing Efficiency | |
T2 large ship time duration -20% | Advanced Large Ship Manufacturing Time Efficiency | ||
Ammunition materual usage -2% | Ammunition Manufacturing Material Efficiency | Ammunition Manufacturing Efficiency | Equipment and Consumable Manufacturing Efficiency |
Ammunition time duration -20% | Ammunition Manufacturing Time Efficiency | ||
Drone and fighter material usage -2% | Drone and Fighter Manufacturing Material Efficiency | Drone and Fighter Manufacturing Efficiency | |
Drone and fighter time duration -20% | Drone and Fighter Manufacturing Time Efficiency | ||
Ship module, ship rig, deployable, implant, cargo container material usage -2% | Equipment Manufacturing Material Efficiency | Equipment Manufacturing Efficiency | |
Ship module, ship rig, deployable, implant, cargo container time duration -20% | Equipment Manufacturing Time Efficiency | ||
Blueprint copy ISK cost -10% | Blueprint Copy Cost Optimization | Blueprint Copy Optimization | Laboratory Optimization |
Blueprint copy time duration -20% | Blueprint Copy Accelerator | ||
ME research ISK cost -10% | ME Research Cost Optimization | ME Research Optimization | |
ME research time duration -20% | ME Research Accelerator | ||
TE research ISK cost -10% | TE Research Cost Optimization | TE Research Optimization | |
TE research time duration -20% | TE Research Accelerator | ||
Invention ISK cost -10% | Invention Cost Optimization | Invention Optimization | |
Invention time duration -20% | Invention Accelerator |
resource
Resource processing rigs | Improved refnng yeld for asterod ores | M-Set Asterod Ore Gradng Processor | L-Set Reprocessng Montor | XL-Set Reprocessng Montor | ||||
---|---|---|---|---|---|---|---|---|
Improved refining yeld for asteroid ores | M-Set Asteroid Ore Grading Processor | |||||||
Improved refining yeld for moon asteroids | M-Set Moon Ore Grading Processor | |||||||
Improved refining yeld for ice | M-Set ce Grading Processor | L-Set Reactor Effcency | ||||||
Biochemical reactions material usage reduction | M-Set Biochemical Reactor Material Efficiency | |||||||
Biochemical reactions time duration reduction | M-Set Biochemical Reactor Time Efficiency | |||||||
Composite reactions material usage reduction | M-Set Composite Reactor Material Efficiency | |||||||
Composite reactions time duration reduction | M-Set Composite Reactor Time Efficiency | |||||||
Hybrid reactions material usage reduction | M-Set Hybrid Reactor Material Efficiency | |||||||
Hybrid reactions time duration reduction | M-Set Hybrid Reactor Time Efficiency | L-Set Moon Drllng Profcency | ||||||
ncreased moon driling yeld | M-Set Moon Drilling Efficiency |