User:Hirmuolio Pine/sandbox
From EVE University Wiki
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
manufacturing
Engineering rigs | |||
---|---|---|---|
Effect | M-rig | L-rig | XL-rig |
T2 component material usage reduction | Advanced Component Manufacturing Material Efficiency | Advanced Component Manufacturing Efficiency | Structure and Component Manufacturing Efficiency |
T2 component time duration reduction | Advanced Component Manufacturing Time Efficiency | ||
Capital component material usage reduction | Basic Capital Component Manufacturing Material Efficiency | Basic Capital Component Manufacturing Efficiency | |
Capital component time duration reduction | Basic Capital Component Manufacturing Time Efficiency | ||
Structure, structure component, structure rig and fuel block material usage reduction | Structure Manufacturing Material Efficiency | Structure Manufacturing Efficiency | |
Structure, structure component, structure rig and fuel block time duration reduction | Structure Manufacturing Time Efficiency | ||
T1 small ship material usage reduction | Basic Small Ship Manufacturing Material Efficiency | Basic Small Ship Manufacturing Efficiency | Ship Manufacturing Efficiency |
T1 small ship time duration reduction | Basic Small Ship Manufacturing Time Efficiency | ||
T1 medium ship material usage reduction | Basic Medium Ship Manufacturing Material Efficiency | Basic Medium Ship Manufacturing Efficiency | |
T1 medium ship time duration reduction | Basic Medium Ship Manufacturing Time Efficiency | ||
T1 large ship material usage reduction | Basic Large Ship Manufacturing Material Efficiency | Basic Large Ship Manufacturing Efficiency | |
T1 large ship time duration reduction | Basic Large Ship Manufacturing Time Efficiency | ||
T2 Small ship material usage reduction | Advanced Small Ship Manufacturing Material Efficiency | Advanced Small Ship Manufacturing Efficiency | |
T2 small ship time duration reduction | Advanced Small Ship Manufacturing Time Efficiency | ||
T2 medium ship material usage reduction | Advanced Medium Ship Manufacturing Material Efficiency | Advanced Medium Ship Manufacturing Efficiency | |
T2 medium ship time duration reduction | Advanced Medium Ship Manufacturing Time Efficiency | ||
T2 large ship material usage reduction | Advanced Large Ship Manufacturing Material Efficiency | Advanced Large Ship Manufacturing Efficiency | |
T2 large ship time duration reduction | Advanced Large Ship Manufacturing Time Efficiency | ||
Ammunition materual usage reduction | Ammunition Manufacturing Material Efficiency | Ammunition Manufacturing Efficiency | Equipment and Consumable Manufacturing Efficiency |
Ammunition time duration reduction | Ammunition Manufacturing Time Efficiency | ||
Drone and fighter material usage reduction | Drone and Fighter Manufacturing Material Efficiency | Drone and Fighter Manufacturing Efficiency | |
Drone and fighter time duration reduction | Drone and Fighter Manufacturing Time Efficiency | ||
Ship module, ship rig, deployable, implant and cargo container material usage reduction | Equipment Manufacturing Material Efficiency | Equipment Manufacturing Efficiency | |
Ship module, ship rig, deployable, implant and cargo container time duration reduction | Equipment Manufacturing Time Efficiency | ||
Blueprint copy ISK cost reduction | Blueprint Copy Cost Optimization | Blueprint Copy Optimization | Laboratory Optimization |
Blueprint copy time duration reduction | Blueprint Copy Accelerator | ||
ME research ISK cost reduction | ME Research Cost Optimization | ME Research Optimization | |
ME research time duration reduction | ME Research Accelerator | ||
TE research ISK cost reduction | TE Research Cost Optimization | TE Research Optimization | |
TE research time duration reduction | TE Research Accelerator | ||
Invention ISK cost reduction | Invention Cost Optimization | Invention Optimization | |
Invention time duration reduction | Invention Accelerator |
resource
Resource processing rigs | |||
---|---|---|---|
Improved refnng yeld for asterod ores | M-Set Asterod Ore Gradng Processor | L-Set Reprocessng Montor | XL-Set Reprocessng Montor |
Improved refining yeld for asteroid ores | M-Set Asteroid Ore Grading Processor | ||
Improved refining yeld for moon asteroids | M-Set Moon Ore Grading Processor | ||
Improved refining yeld for ice | M-Set ce Grading Processor | L-Set Reactor Effcency | |
Biochemical reactions material usage reduction | M-Set Biochemical Reactor Material Efficiency | ||
Biochemical reactions time duration reduction | M-Set Biochemical Reactor Time Efficiency | ||
Composite reactions material usage reduction | M-Set Composite Reactor Material Efficiency | ||
Composite reactions time duration reduction | M-Set Composite Reactor Time Efficiency | ||
Hybrid reactions material usage reduction | M-Set Hybrid Reactor Material Efficiency | ||
Hybrid reactions time duration reduction | M-Set Hybrid Reactor Time Efficiency | L-Set Moon Drllng Profcency | |
ncreased moon driling yeld | M-Set Moon Drilling Efficiency |