Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Blueprints: Difference between revisions

From EVE University Wiki
Studentay (talk | contribs)
No edit summary
Line 27: Line 27:
===Copies===
===Copies===
Only Blueprint Originals can be copied.  The copies will have the ME and PE of the BPO being copied. In addition, they will be licensed for a set number of runs, the maximum of which is dictated by the BPO. Once the runs are used up, the BPC is consumed.
Only Blueprint Originals can be copied.  The copies will have the ME and PE of the BPO being copied. In addition, they will be licensed for a set number of runs, the maximum of which is dictated by the BPO. Once the runs are used up, the BPC is consumed.
===Terminology===
BPO: Blueprint original. Has infinite licensed production runs.
BPC: Blueprint copy. Has limited licensed production runs. One can make copies of BPOs - the result are BPCs.
M.L.: Material Level.
P.L.: Productivity Level.
Licensed production runs: The number of times a blueprint (BPO or BPC) can be used to produce an item.
===How to Identify a Blueprint===
1. Right-click on the blueprint and select "Show Info"
2. Select the "Attributes" tab
3. The first line/row will indicate if this is a BPO or a BPC: For BPO it will say "Original Blueprint", and for BPC it will say "Blueprint Copy"


[[Category:Guides]]
[[Category:Guides]]