Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Metenox Moon Drill: Difference between revisions

From EVE University Wiki
No edit summary
DrBreak (talk | contribs)
Deployment: Reword this entire section
 
(2 intermediate revisions by 2 users not shown)
Line 8: Line 8:
== Deployment ==
== Deployment ==


The Metenox Moon drill must be placed at the moon mining point of any moon in Low-Sec, Null, or Wormhole space and occupies the same location an Athanor or Tatara would.  
The Metenox Moon drill must be placed at the moon mining point of any moon in Low-Sec, Null, or Wormhole space and occupies the same location an Athanor or Tatara would. It does not provide docking or tethering.


It will require a [https://everef.net/types/81920 Integrated Moon Drill Armature] which functions as its [[Quantum_Cores|Core]] (though it does not provide docking or tethering) and is a guaranteed 100% drop just like a core.
A [https://everef.net/types/81920 Integrated Moon Drill Armature] is required during manufacturing. It has the same function as a [[Quantum_Cores|core]] in other structures, which means it drops when the moon drill is destroyed. As the armature is added during manufacturing, it does not need to be inserted after anchoring.


{{Note box|Additional details need added on the deployment process, times, required minimum fuel, reagents, ect}}
Anchoring this structure takes 45 minutes. This timer is increased to 4.5 hours in Sov Null systems which is not owned by the anchoring alliance.
When the anchoring process ends, fuel blocks and magmatic gas need to be inserted in the cargo deposit, which automatically transfers it to the fuel bay. Following this, a pilot in their capsule can 'board' the moon drill and open the fitting window to online the integrated service module. This causes the module to start consuming fuel and brings the moon drill out of its low power state after a few minutes.


== Mining ==
== Mining ==