More actions
m Changed Energy Grid Upgrades to IV for Logistics |
|||
| Line 117: | Line 117: | ||
Capacitor Management IV<br> | Capacitor Management IV<br> | ||
Capacitor Systems Operation IV<br> | Capacitor Systems Operation IV<br> | ||
Energy Grid Upgrades | Energy Grid Upgrades IV<small> <ref>'''Energy Grid Upgrades IV''' is required for the reactor controls and power diagnostic modules.</ref></small><br> | ||
Shield Upgrades IV<small> <ref><strong>Shield Upgrades IV</strong> is a requirement for the <strong>Large Shield Extender II</strong> modules. Only <strong>Basilisk</strong> pilots need this, <strong>Scimitar</strong> pilots will not need it.</ref></small><br> | Shield Upgrades IV<small> <ref><strong>Shield Upgrades IV</strong> is a requirement for the <strong>Large Shield Extender II</strong> modules. Only <strong>Basilisk</strong> pilots need this, <strong>Scimitar</strong> pilots will not need it.</ref></small><br> | ||
Shield Management III<br> | Shield Management III<br> | ||