More actions
Rose chanlin (talk | contribs) No edit summary |
Rose chanlin (talk | contribs) |
||
| Line 76: | Line 76: | ||
where this ratio has been suggested to be 4.8 , 4.9 or 5.0 | where this ratio has been suggested to be 4.8 , 4.9 or 5.0 | ||
edit: CCP Larrikin confirmed on 14 nov 2016 that the constant is 5.0 | |||
dC/dt (peak) = Cmax/(2*Tau) = Cmax/(2 * "Cap recharge time" / constant) = (constant/2)*(Cmax / "Cap recharge time") | dC/dt (peak) = Cmax/(2*Tau) = Cmax/(2 * "Cap recharge time" / constant) = (constant/2)*(Cmax / "Cap recharge time") | ||