More actions
| Line 430: | Line 430: | ||
Energy Grid Upgrades II<br> | Energy Grid Upgrades II<br> | ||
Energy Systems Operation I<br> | Energy Systems Operation I<br> | ||
Engineering IV<br> | |||
Gallente Cruiser II<br> | Gallente Cruiser II<br> | ||
Hull Upgrades I<br> | Hull Upgrades I<br> | ||
| Line 438: | Line 439: | ||
* Cargohold should have 3 range scripts to switch if needed, and as many 800 cap charges as can fit. | * Cargohold should have 3 range scripts to switch if needed, and as many 800 cap charges as can fit. | ||
* Engineering IV is required for the 3rd neut. With Engineering III, 2 neuts will do. | |||
==Exequror== | ==Exequror== | ||