More actions
m punctuation |
m →Ships and Fitting: corrections |
||
| Line 108: | Line 108: | ||
Unbonused ship with 5 T2 harvesters = 20*5/40 = 2.5 m^3/s | Unbonused ship with 5 T2 harvesters = 20*5/40 = 2.5 m^3/s | ||
Venture with 2 T2 harvesters | Venture with 2 T2 harvesters and Mining Frigate 4 = 20*2*2/32 = 2.5 m^3/s | ||
Venture with 2 T2 harvesters and Mining Frigate 5 = 20*2*2/30 = 2.67 m^3/s | |||
== In Conclusion == | == In Conclusion == | ||