m Add patch notes for 2024-07-18.1. Transform and Clean-up. |
m Update status. |
||
| Line 17: | Line 17: | ||
* {{PatchNoteStatus|tbd|All Prospecting Array upgrades | * {{PatchNoteStatus|tbd|All Prospecting Array upgrades | ||
** Several asteroids have been combined so that the majority of asteroids in each location require multiple strip miner cycles to mine out.}} | ** Several asteroids have been combined so that the majority of asteroids in each location require multiple strip miner cycles to mine out.}} | ||
* {{PatchNoteStatus| | * {{PatchNoteStatus|done|Isogen Prospecting Array (Griemeer Deposit) | ||
** Total Ore Volume increased from 2,631,000 m3 to 3,000,000 m3.}} | ** Total Ore Volume increased from 2,631,000 m3 to 3,000,000 m3.}} | ||
* {{PatchNoteStatus| | * {{PatchNoteStatus|done|Megacyte Prospecting Array (Ueganite Deposit) | ||
** Total Ore Volume increased from 1,982,287 m3 to 4,000,000 m3.}} | ** Total Ore Volume increased from 1,982,287 m3 to 4,000,000 m3.}} | ||
* {{PatchNoteStatus| | * {{PatchNoteStatus|done|Mexallon Prospecting Array (Kylxium Deposit) | ||
** Total Ore Volume increased from 2,040,000 m3 to 3,000,000m3.}} | ** Total Ore Volume increased from 2,040,000 m3 to 3,000,000m3.}} | ||
* {{PatchNoteStatus| | * {{PatchNoteStatus|done|Nocxium Prospecting Array (<s>Noxcite</s> Nocxite Deposit) | ||
** Total Ore Volume increased from 2,100,008 m3 to 3,000,000 m3.}} | ** Total Ore Volume increased from 2,100,008 m3 to 3,000,000 m3.}} | ||
* {{PatchNoteStatus| | * {{PatchNoteStatus|done|Pyerite Prospecting Array (Mordunium Deposit) | ||
** Total Ore Volume increased from 4,500,000 m3 to 6,000,000 m3. | ** Total Ore Volume increased from 4,500,000 m3 to 6,000,000 m3. | ||
** Rebalanced the ore content of the site to a smaller overall percentage of Mordunium asteroids and more Omber and Hedbergite to improve the average ISK/hr of mining in the site.}} | ** Rebalanced the ore content of the site to a smaller overall percentage of Mordunium asteroids and more Omber and Hedbergite to improve the average ISK/hr of mining in the site.}} | ||
* {{PatchNoteStatus| | * {{PatchNoteStatus|done|Tritanium Prospecting Array (Veldspar Deposit)Total Ore Volume increased from 3,000,000 m3 to 4,000,000 m3.}} | ||
* {{PatchNoteStatus| | * {{PatchNoteStatus|done|Zydrine Prospecting Array (Hezorime Deposit) | ||
** Total ore Volume increased from 2,015,799 m3 to 5,970,000 m3. | ** Total ore Volume increased from 2,015,799 m3 to 5,970,000 m3. | ||
** The size of several asteroids have been vastly increased to make this site very comparable to the Colossal Asteroid Cluster, with 24+ asteroids bigger than 100,000m3 and a behemoth 600,000m3 asteroid.}} | ** The size of several asteroids have been vastly increased to make this site very comparable to the Colossal Asteroid Cluster, with 24+ asteroids bigger than 100,000m3 and a behemoth 600,000m3 asteroid.}} | ||