More actions
| Line 70: | Line 70: | ||
*''provision of a reserve'' For instance, in the event that an operation is going to proceed over many hours, shifts of miners, haulers, and boosters can be drawn up ahead of time. | *''provision of a reserve'' For instance, in the event that an operation is going to proceed over many hours, shifts of miners, haulers, and boosters can be drawn up ahead of time. | ||
*''centralised control at the appropriate level'' For instance, in very large scale operations (a very large fleet), it makes little sense to insist that the entire fleet remain in one system. However that will require detailed control of boosters and their movements to maximise the time when best boosts are available. Wings might be organised that have their own best boosts and be assigned to different systems. | *''centralised control at the appropriate level'' For instance, in very large scale operations (a very large fleet), it makes little sense to insist that the entire fleet remain in one system. However that will require detailed control of boosters and their movements to maximise the time when best boosts are available. Wings might be organised that have their own best boosts and be assigned to different systems. | ||
==== Mobility ==== | ==== Mobility ==== | ||