More actions
m →Tier 2 - Refined Commodities (P2): small clarification added |
|||
| Line 57: | Line 57: | ||
|} | |} | ||
One processed batch turns 30 m³ of a P0 material into 7.6 m³ of a P1 material, resulting in a reduction to 25% of original volume. Each batch takes 30 minutes to process in a Basic Industry Facility (BIF). | One processed batch turns 3000 units or 30 m³ of a P0 material into 7.6 m³ of a P1 material, resulting in a reduction to 25% of original volume. Each batch takes 30 minutes to process in a Basic Industry Facility (BIF). You thus need to have enough extractor heads to supply 3000 units of P0 in 30 minutes, or 6000 units per hour to the BIF, to avoid idle time on a BIF. | ||
== Tier 2 - Refined Commodities (P2) == | == Tier 2 - Refined Commodities (P2) == | ||