Difference between revisions of "Archive:BPO Copying Service"

From EVE University Wiki
Jump to: navigation, search
(Moving page from old inactive services category to deprecated pages)
 
(5 intermediate revisions by 5 users not shown)
Line 1: Line 1:
[[Category:Services]]
+
{{deprecated}}
{{Member Services}}
 
 
__NOTOC__
 
__NOTOC__
<br>
+
The University will now be offering copy services for EVE University members through <span style="color:white">Ivy League Research and Development</span> , a part of the Ivy League. (Corp Ticker: IL-RD)
'''The University will now be offering copy services for Eve University members through <span style="color:white">Ivy League Research and Development</span> , a part of the Ivy League. (Corp Ticker: IL-RD) <br>
+
 
The procedures and restrictions are listed below.'''
+
The procedures and restrictions are listed below.
<br>
 
<br>
 
== Program Suspended due to lack of interest ==
 
  
 
== Goals of the Program ==
 
== Goals of the Program ==
Line 17: Line 13:
 
== Procedures ==
 
== Procedures ==
  
* Contract the BPO you want copied to <span style="color:white">Ivy League Research and Development</span> . <br>
+
* Contract the BPO you want copied to <span style="color:white">Ivy League Research and Development</span> .  
* Fill out this form http://spreadsheets.google.com/viewform?formkey=dDIxX3dsdU1Bek53NldYd1BHZTZTeXc6MA with the <u>BPO name</u> and <u>wanted number of copies/runs</u><br>
+
* Fill out this form http://spreadsheets.google.com/viewform?formkey=dDIxX3dsdU1Bek53NldYd1BHZTZTeXc6MA with the <u>BPO name</u> and <u>wanted number of copies/runs</u>
 
* After copying is complete, the BPO and BPCs will be returned to you in a contract. The contract will include the price for copying.
 
* After copying is complete, the BPO and BPCs will be returned to you in a contract. The contract will include the price for copying.
  
Line 33: Line 29:
 
== Timeline ==
 
== Timeline ==
  
* The BPO Copying Service will go active on April 4th 2010.<br>
+
* The BPO Copying Service will go active on April 4th 2010.
* Expect 1-2 days both before a job is installed, and after the copying is done before the job is delivered. <br>
+
* Expect 1-2 days both before a job is installed, and after the copying is done before the job is delivered.  
* This program is overseen by a small staff of alts, and can cause some small delays. <br>
+
* This program is overseen by a small staff of alts, and can cause some small delays.  
* For example, if the character overseeing plays from 18:00-24:00, it is very possible for you to submit a job at 00:05, it'll take to 18:00 hours before they see it, and it'll only get installed then if a slot is available. <br>
+
* For example, if the character overseeing plays from 18:00-24:00, it is very possible for you to submit a job at 00:05, it'll take to 18:00 hours before they see it, and it'll only get installed then if a slot is available.  
* Assuming a slot is available, it might finish at 03:00, and have to sit until 18:00 again to be delivered.<br>
+
* Assuming a slot is available, it might finish at 03:00, and have to sit until 18:00 again to be delivered.
 
* Please be patient, but if you feel a job has gone past what is reasonable, PM [[Azmodeus Valar]] who will look into it.
 
* Please be patient, but if you feel a job has gone past what is reasonable, PM [[Azmodeus Valar]] who will look into it.
  

Latest revision as of 12:19, 8 May 2022

This page is deprecated and no longer in use. There is no replacement information available.

The University will now be offering copy services for EVE University members through Ivy League Research and Development , a part of the Ivy League. (Corp Ticker: IL-RD)

The procedures and restrictions are listed below.

Goals of the Program

  • Allow new industrialists a chance to get BPCs
  • Expand services offered through the University
  • Minimize the risk exposed to both the University and students.

Procedures

Price

  • Copying will run 20k isk per hour

Guidelines

  • No more than 1 BPO copied per person per week, to help open this up to as many people as possible
  • If demand exceeds supply, members new to the program will get priority over members who frequently use the program.
  • Due to skills of the Alt running this program, it is restricted to BPOs that do not require specialized skills to copy (specific to that bpo)

Timeline

  • The BPO Copying Service will go active on April 4th 2010.
  • Expect 1-2 days both before a job is installed, and after the copying is done before the job is delivered.
  • This program is overseen by a small staff of alts, and can cause some small delays.
  • For example, if the character overseeing plays from 18:00-24:00, it is very possible for you to submit a job at 00:05, it'll take to 18:00 hours before they see it, and it'll only get installed then if a slot is available.
  • Assuming a slot is available, it might finish at 03:00, and have to sit until 18:00 again to be delivered.
  • Please be patient, but if you feel a job has gone past what is reasonable, PM Azmodeus Valar who will look into it.

Wartime

  • This program is NOT available during wartime.
  • Jobs completed during wartime will not be delivered until the end of war.