Difference between revisions of "POS Refining"

From EVE University Wiki
Jump to: navigation, search
m
Line 4: Line 4:
 
[[Category:Refining]]
 
[[Category:Refining]]
 
=POS Refining=
 
=POS Refining=
A POS Refinery Array will only handle a single ore at a time, so it is best to create batches of ores and only run complete batches. A single refining run takes 3 hours.
+
A POS Refinery Array will only handle a single ore at a time, so it is best to create batches of ores and only run complete batches.  
 +
 
 +
A Refinery takes 40k m3 and 60 minutes per cycle, but the yield is only 35%.
 +
A Medium Intensive Refinery takes 20k m3 and 90 minutes per cycle, at 75% yield.
 +
An Intensive Refinery takes 200k m3 and 180 minutes per cycle, at 75% yield.
 +
 
 +
The Intensive Refinery is best for serious miners, but the powergrid and CPU use requires that you have a Large POS Tower to support it. The regular Refinery should be avoided as 65% of the value of the ore is lost by using it.
  
 
==Refinery Input==
 
==Refinery Input==

Revision as of 20:43, 17 November 2009

POS Refining

A POS Refinery Array will only handle a single ore at a time, so it is best to create batches of ores and only run complete batches.

A Refinery takes 40k m3 and 60 minutes per cycle, but the yield is only 35%. A Medium Intensive Refinery takes 20k m3 and 90 minutes per cycle, at 75% yield. An Intensive Refinery takes 200k m3 and 180 minutes per cycle, at 75% yield.

The Intensive Refinery is best for serious miners, but the powergrid and CPU use requires that you have a Large POS Tower to support it. The regular Refinery should be avoided as 65% of the value of the ore is lost by using it.

Refinery Input

This is a list of the various ores and details of their volume and how many units will fit into a Intensive Refining Array.

Low End Ores

Ore Volume (m3) Batch Quantity
Veldspar 0.1 2,000,000
Scordite 0.15 1,333,333
Pyroxeres 0.3 666,666
Plagioclase 0.35 571,428
Omber 0.6 333,333
Kernite 1.2 166,666
Jaspet 2 100,000
Hemorphite 3 66,666
Hedbergite 3 66,666

High-End Ores

Ore Volume (m3) Batch Quantity
Gneiss 5 40,000
Dark Ochre 8 25,000
Spodumain 16 12,500
Crokite 16 12,500
Bistot 16 12,500
Arkonor 16 12,500
Mercoxit 40 5,000

Refinery Output

This is a break down of the output from refining a single batch (This assumes efficiency is capped out at 75%)

Refinery output.png