Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

POS Structures: Difference between revisions

From EVE University Wiki
Dʹgo jahn (talk | contribs)
Dʹgo jahn (talk | contribs)
Line 372: Line 372:


The Coupling Array is also useful for when the Harvesters and a Reactor are running/processing at different speeds. For instance, two Harvesters may produce 100 units each an hour. The Reactor may only be able to process the said units every 2 hours. This leaves you with a surplus of 100 units that will be lost in the process. A Coupling Array acts as a buffer to temporarily hold the surplus materials until the Reactor is free.
The Coupling Array is also useful for when the Harvesters and a Reactor are running/processing at different speeds. For instance, two Harvesters may produce 100 units each an hour. The Reactor may only be able to process the said units every 2 hours. This leaves you with a surplus of 100 units that will be lost in the process. A Coupling Array acts as a buffer to temporarily hold the surplus materials until the Reactor is free.
* Location: Inside POS Shield
* Times: 5s Anchor, 3s Online, 5s Unanchor
* Fitting: 155tf CPU, 10K MW PG
* Size: 4,000 m3
* Capacity: 1,500 m3


==Defensive Structures==
==Defensive Structures==