User:Hirmuolio Pine/sandbox
From EVE University Wiki
< User:Hirmuolio Pine
Revision as of 09:54, 24 December 2019 by Hirmuolio Pine (talk | contribs)
Effect | M-rig | L-rig | XL-rig |
---|---|---|---|
T2 component material usage -2% | Advanced Component Manufacturing Material Efficiency | Advanced Component Manufacturing Efficiency | Structure and Component Manufacturing Efficiency |
T2 component time duration -20% | Advanced Component Manufacturing Time Efficiency | ||
Capital component material usage -2% | Basic Capital Component Manufacturing Material Efficiency | Basic Capital Component Manufacturing Efficiency | |
Capital component time duration -20% | Basic Capital Component Manufacturing Time Efficiency | ||
Structure, structure component, structure rig and fuel block material usage -2% | Structure Manufacturing Material Efficiency | Structure Manufacturing Efficiency | |
Structure, structure component, structure rig and fuel block time duration -20% | Structure Manufacturing Time Efficiency | ||
T1 small ship material usage -2% | Basic Small Ship Manufacturing Material Efficiency | Basic Small Ship Manufacturing Efficiency | Ship Manufacturing Efficiency |
T1 small ship time duration -20% | Basic Small Ship Manufacturing Time Efficiency | ||
T1 medium ship material usage -2% | Basic Medium Ship Manufacturing Material Efficiency | Basic Medium Ship Manufacturing Efficiency | |
T1 medium ship time duration -20% | Basic Medium Ship Manufacturing Time Efficiency | ||
T1 large ship material usage -2% | Basic Large Ship Manufacturing Material Efficiency | Basic Large Ship Manufacturing Efficiency | |
T1 large ship time duration -20% | Basic Large Ship Manufacturing Time Efficiency | ||
T2 Small ship material usage -2% | Advanced Small Ship Manufacturing Material Efficiency | Advanced Small Ship Manufacturing Efficiency | |
T2 small ship time duration -20% | Advanced Small Ship Manufacturing Time Efficiency | ||
T2 medium ship material usage -2% | Advanced Medium Ship Manufacturing Material Efficiency | Advanced Medium Ship Manufacturing Efficiency | |
T2 medium ship time duration -20% | Advanced Medium Ship Manufacturing Time Efficiency | ||
T2 large ship material usage -2% | Advanced Large Ship Manufacturing Material Efficiency | Advanced Large Ship Manufacturing Efficiency | |
T2 large ship time duration -20% | Advanced Large Ship Manufacturing Time Efficiency | ||
Ammunition materual usage -2% | Ammunition Manufacturing Material Efficiency | Ammunition Manufacturing Efficiency | Equipment and Consumable Manufacturing Efficiency |
Ammunition time duration -20% | Ammunition Manufacturing Time Efficiency | ||
Drone and fighter material usage -2% | Drone and Fighter Manufacturing Material Efficiency | Drone and Fighter Manufacturing Efficiency | |
Drone and fighter time duration -20% | Drone and Fighter Manufacturing Time Efficiency | ||
Ship module, ship rig, deployable, implant, cargo container material usage -2% | Equipment Manufacturing Material Efficiency | Equipment Manufacturing Efficiency | |
Ship module, ship rig, deployable, implant, cargo container time duration -20% | Equipment Manufacturing Time Efficiency | ||
Blueprint copy ISK cost -10% | Blueprint Copy Cost Optimization | Blueprint Copy Optimization | Laboratory Optimization |
Blueprint copy time duration -20% | Blueprint Copy Accelerator | ||
ME research ISK cost -10% | ME Research Cost Optimization | ME Research Optimization | |
ME research time duration -20% | ME Research Accelerator | ||
TE research ISK cost -10% | TE Research Cost Optimization | TE Research Optimization | |
TE research time duration -20% | TE Research Accelerator | ||
Invention ISK cost -10% | Invention Cost Optimization | Invention Optimization | |
Invention time duration -20% | Invention Accelerator |