User:Hirmuolio Pine/sandbox
From EVE University Wiki
manufacturing
Engineering rigs | |||
---|---|---|---|
Effect | M-rig | L-rig | XL-rig |
T2 component material usage reduction | Advanced Component Manufacturing Material Efficiency | Advanced Component Manufacturing Efficiency | Structure and Component Manufacturing Efficiency |
T2 component time duration reduction | Advanced Component Manufacturing Time Efficiency | ||
Capital component material usage reduction | Basic Capital Component Manufacturing Material Efficiency | Basic Capital Component Manufacturing Efficiency | |
Capital component time duration reduction | Basic Capital Component Manufacturing Time Efficiency | ||
Structure, structure component, structure rig and fuel block material usage reduction |
Structure Manufacturing Material Efficiency | Structure Manufacturing Efficiency | |
Structure, structure component, structure rig and fuel block time duration reduction |
Structure Manufacturing Time Efficiency | ||
T1 small ship material usage reduction | Basic Small Ship Manufacturing Material Efficiency | Basic Small Ship Manufacturing Efficiency | Ship Manufacturing Efficiency |
T1 small ship time duration reduction | Basic Small Ship Manufacturing Time Efficiency | ||
T1 medium ship material usage reduction | Basic Medium Ship Manufacturing Material Efficiency | Basic Medium Ship Manufacturing Efficiency | |
T1 medium ship time duration reduction | Basic Medium Ship Manufacturing Time Efficiency | ||
T1 large ship material usage reduction | Basic Large Ship Manufacturing Material Efficiency | Basic Large Ship Manufacturing Efficiency | |
T1 large ship time duration reduction | Basic Large Ship Manufacturing Time Efficiency | ||
T2 Small ship material usage reduction | Advanced Small Ship Manufacturing Material Efficiency | Advanced Small Ship Manufacturing Efficiency | |
T2 small ship time duration reduction | Advanced Small Ship Manufacturing Time Efficiency | ||
T2 medium ship material usage reduction | Advanced Medium Ship Manufacturing Material Efficiency | Advanced Medium Ship Manufacturing Efficiency | |
T2 medium ship time duration reduction | Advanced Medium Ship Manufacturing Time Efficiency | ||
T2 large ship material usage reduction | Advanced Large Ship Manufacturing Material Efficiency | Advanced Large Ship Manufacturing Efficiency | |
T2 large ship time duration reduction | Advanced Large Ship Manufacturing Time Efficiency | ||
Ammunition materual usage reduction | Ammunition Manufacturing Material Efficiency | Ammunition Manufacturing Efficiency | Equipment and Consumable Manufacturing Efficiency |
Ammunition time duration reduction | Ammunition Manufacturing Time Efficiency | ||
Drone and fighter material usage reduction | Drone and Fighter Manufacturing Material Efficiency | Drone and Fighter Manufacturing Efficiency | |
Drone and fighter time duration reduction | Drone and Fighter Manufacturing Time Efficiency | ||
Ship module, ship rig, deployable, implant and cargo container material usage reduction |
Equipment Manufacturing Material Efficiency | Equipment Manufacturing Efficiency | |
Ship module, ship rig, deployable, implant and cargo container time duration reduction |
Equipment Manufacturing Time Efficiency | ||
Blueprint copy ISK cost reduction | Blueprint Copy Cost Optimization | Blueprint Copy Optimization | Laboratory Optimization |
Blueprint copy time duration reduction | Blueprint Copy Accelerator | ||
ME research ISK cost reduction | ME Research Cost Optimization | ME Research Optimization | |
ME research time duration reduction | ME Research Accelerator | ||
TE research ISK cost reduction | TE Research Cost Optimization | TE Research Optimization | |
TE research time duration reduction | TE Research Accelerator | ||
Invention ISK cost reduction | Invention Cost Optimization | Invention Optimization | |
Invention time duration reduction | Invention Accelerator |
resource
Resource processing rigs | |||
---|---|---|---|
Improved refnng yeld for asterod ores | M-Set Asterod Ore Gradng Processor | L-Set Reprocessng Montor | XL-Set Reprocessng Montor |
Improved refining yeld for asteroid ores | M-Set Asteroid Ore Grading Processor | ||
Improved refining yeld for moon asteroids | M-Set Moon Ore Grading Processor | ||
Improved refining yeld for ice | M-Set ce Grading Processor | L-Set Reactor Effcency | |
Biochemical reactions material usage reduction | M-Set Biochemical Reactor Material Efficiency | ||
Biochemical reactions time duration reduction | M-Set Biochemical Reactor Time Efficiency | ||
Composite reactions material usage reduction | M-Set Composite Reactor Material Efficiency | ||
Composite reactions time duration reduction | M-Set Composite Reactor Time Efficiency | ||
Hybrid reactions material usage reduction | M-Set Hybrid Reactor Material Efficiency | ||
Hybrid reactions time duration reduction | M-Set Hybrid Reactor Time Efficiency | L-Set Moon Drllng Profcency | |
ncreased moon driling yeld | M-Set Moon Drilling Efficiency |