Difference between revisions of "Engineering Complexes"

From EVE University Wiki
Jump to: navigation, search
m (Point redirect to specific section.)
Tag: Redirect target changed
 
(6 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Current}}
+
#REDIRECT [[Upwell structures#Engineering complexes]]
Engineering Complexes are a new type of structure introduced during the Ascension expansion. These structures, and the service modules that came with them, are intended to replace research and manufacturing functionality currently available in Outposts and Starbases.
 
 
 
= Size variants =
 
There are currently three different sizes of Engineering Complexes; the medium '''Raitaru''', the large '''Azbel''' and the extra-large '''Sotiyo'''.
 
{| style="text-align:center;"
 
| valign="top" | [[image:raitaru.png|thumb|212px|'''Raitaru''' (medium)]]
 
| valign="top" | [[image:azbel.jpg|thumb|212px|'''Azbel''' (large)]]
 
| valign="top" | [[image:sotiyo.jpg|thumb|212px|'''Sotiyo''' (extra-large)]]
 
|}
 
 
 
 
 
= Anchoring an Engineering Complex =
 
{{main|Anchoring structures}}
 
In order to anchor an Engineering Complex you'll need a ship with an appropriately sized cargo hold or fleet hangar, the right roles and a suitable spot to anchor your structure. After that the whole building process, while automatic, takes 24 hours.
 

Latest revision as of 10:19, 24 December 2023