More actions
m Add link. |
m Change transition planned date. |
||
| Line 7: | Line 7: | ||
Sovereignty Hub Transition (Planned for 20 June 2024) | Sovereignty Hub Transition (Planned for <s>20 June 2024</s> 27 June 2024) [https://www.eveonline.com/news/view/equinox-expands-a-new-update Delay reason] | ||
The transfer period will end with the next expansion, when any sovereignty hub operating in legacy IHub mode will be automatically transitioned into Sov Hub mode. | The transfer period will end with the next expansion, when any sovereignty hub operating in legacy IHub mode will be automatically transitioned into Sov Hub mode. | ||
| Line 18: | Line 18: | ||
Upgrades (Planned for 20 June 2024) | Upgrades (Planned for <s>20 June 2024</s> 27 June 2024) | ||
* Once an alliance has deployed a new Sov Hub in Sov Hub mode or chosen to transition their Sov Hub from IHub Mode to Sov Hub Mode, they are then able to install the new upgrades. | * Once an alliance has deployed a new Sov Hub in Sov Hub mode or chosen to transition their Sov Hub from IHub Mode to Sov Hub Mode, they are then able to install the new upgrades. | ||
* Upgrades cannot be installed if the energy cost of installed upgrades (regardless of state) would exceed the potential energy which the system could produce (assuming all planets had skyhooks installed). | * Upgrades cannot be installed if the energy cost of installed upgrades (regardless of state) would exceed the potential energy which the system could produce (assuming all planets had skyhooks installed). | ||