More actions
m Missed some PMs. |
m Update link. |
||
| (One intermediate revision by one other user not shown) | |||
| Line 87: | Line 87: | ||
=== Asset safety === | === Asset safety === | ||
{{Main|Asset | {{Main|Asset safety}} | ||
As well as personal asset safety for items in [[Upwell structures]] it is possible to set up corporation asset safety. for more information see the main page on asset safety. | As well as personal asset safety for items in [[Upwell structures]] it is possible to set up corporation asset safety. for more information see the main page on asset safety. | ||
| Line 127: | Line 127: | ||
After a Corporation is made the CEO, Director, and Project Manager can create Projects. Corporation Projects are a tool that enables corporations to provide their members with direction and rewards. They do this by paying out when pilots do activities the project specifies. | After a Corporation is made the CEO, Director, and Project Manager can create Projects. Corporation Projects are a tool that enables corporations to provide their members with direction and rewards. They do this by paying out when pilots do activities the project specifies. | ||
There are twelve types of projects. These were expanded from five in the Havoc expansion<ref>https://www.eveonline.com/news/view/havoc-expansion-notes</ref>. The general structure of a project is some type dependent optional restrictions to focus the project, a total limit on the number of times the project will be paid out, a name/title, a description, an AIR Opportunities category, and a per time payout. Each project can get a project hangar where the deliveries need to be made to to be recognized. | There are twelve types of projects. These were expanded from five in the Havoc expansion<ref>https://www.eveonline.com/news/view/corporations-enhanced</ref><ref>https://www.eveonline.com/news/view/havoc-expansion-notes</ref>. The general structure of a project is some type dependent optional restrictions to focus the project, a total limit on the number of times the project will be paid out, a name/title, a description, an AIR Opportunities category, and a per time payout. Each project can get a project hangar where the deliveries need to be made to to be recognized. | ||
The types of Projects are: | The types of Projects are: | ||