Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Research: Difference between revisions

From EVE University Wiki
m Put formulas into <math>. Remove the namespace (Template) from template call, it is the default so not needed. Change unneeded piped link, making use of redirect.
m Explain what EIV is based on for copy/invention.
Line 233: Line 233:


where the system cost index is calculated in the same way as it was for researching but with work hours done on copying jobs.
where the system cost index is calculated in the same way as it was for researching but with work hours done on copying jobs.
Surprisingly for both invention and copying the Material Adjusted price is still based on the Manufacturing inputs of the final item.
If you copy a Damage Control I blueprint for example, you need to calculate the EIV based on the manufacturing inputs for a Damage Control I module.
While for invention it will be based on the manufacturing inputs for the T2 item itself.


=== Why should I copy my BPOs? ===
=== Why should I copy my BPOs? ===