Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

User:Hirmuolio Pine/sandbox4: Difference between revisions

From EVE University Wiki
Hirmuolio Pine (talk | contribs)
No edit summary
Hirmuolio Pine (talk | contribs)
Line 198: Line 198:
::'' Job cost = Process Time Value × System cost index × Structure bonus × Facility tax'',
::'' Job cost = Process Time Value × System cost index × Structure bonus × Facility tax'',


where Process Time Value is a number derived from the material cost of producing the item, blueprint rank and blueprint research level (ME and TE handled separately) and the system cost index is  
where Process Time Value is a number derived from the material cost of producing the item, blueprint rank and blueprint research level (ME and TE handled separately) and the system cost index is a number derived from the ammount of work done in that system.
 
The system cost idex is calculated as


::'' System cost index = sqrt( Work hours done in system in past 28 days / Work hours done in universe in past 28 days ) ''
::'' System cost index = sqrt( Work hours done in system in past 28 days / Work hours done in universe in past 28 days ) ''
(Work hours tracked separately for ME researc, TE research, copying, manufacturing and reactions).
(Work hours tracked separately for ME researc, TE research, copying, manufacturing and reactions).
The Process Time Value for researching to leven ''n'' is calculated as
::'' sum( number of materials × adjusted price ) × (0.02 / 105) × ( Base duration<sub>n</sub> - Base duration<sub>n-1</sub>)''


== Why should I copy my BPOs? ==
== Why should I copy my BPOs? ==