Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Manufacturing: Difference between revisions

From EVE University Wiki
Kivena (talk | contribs)
T3 Production: removing references to reverse engineering
Rounding "errors"
Line 85: Line 85:
Finally, once the job is completed, job listed in the Jobs tab will contain a large Deliver button instead of a time remaining display;  press this and the results & blueprint will be returned to the station.
Finally, once the job is completed, job listed in the Jobs tab will contain a large Deliver button instead of a time remaining display;  press this and the results & blueprint will be returned to the station.


==== Beware of rounding "errors"! ====
A particular problem that can quickly cost you a million ISK or two when manufacturing T2 items is the rounding that is applied as an effect of material efficiency: a single industry job with 3 runs can use ''less'' material than 3 single jobs from the same blueprint!


== T2 Production ==
== T2 Production ==