Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

Metamorphosis: Difference between revisions

From EVE University Wiki
Elan Vital (talk | contribs)
m Summary: changed "including" to "namely"
Elan Vital (talk | contribs)
m Notes: changed "jetcanning" to "jet can" as it should be infinitive form of that phrasal verb rather the gerund
Line 109: Line 109:


==Notes==
==Notes==
While the ship has a mobile depot bay, returning the mobile depot requires scooping the mobile depot into the cargo bay first before dragging it to the mobile depot bay. If the ship lacks the required cargo space, the pilot will need to jettison (jet canning) enough cargo to make space for the mobile depot, scoop the depot, move it to the mobile depot bay, and then recover the cargo from the jet can.
While the ship has a mobile depot bay, returning the mobile depot requires scooping the mobile depot into the cargo bay first before dragging it to the mobile depot bay. If the ship lacks the required cargo space, the pilot will need to jettison (jet can) enough cargo to make space for the mobile depot, scoop the depot, move it to the mobile depot bay, and then recover the cargo from the jet can.


== Patch History ==
== Patch History ==